AFL, NRL, NFL, NBA, NHL, A-League, EPL, MLS

Showing posts with label lean construction. Show all posts
Showing posts with label lean construction. Show all posts

Sunday, December 16, 2012

Rio Tinto = Productivity = Efficiency = Innovation = Sustainability = Profits

Rio Tinto leads the world in using business improvement tools to streamline their operations, making them the cheapest producer of iron ore in the world, as well as being the second largest.

Sam Walsh, Rio Tinto’s iron ore chief, attributes this advantage through smart use of technology and innovation.  “It’s about thinking of mining as a factory”, Mr Walsh says[1].

By taking ideas from the car industry, which happens to be one of the largest customers, Rio Tinto has been able to adopt the principles and approaches to innovation and sharing of ideas.

It is a little know secret to many that Mr Walsh stems from the car industry.  Utilising the same leadership and management techniques that transformed the Japanese manufacturing sector, Mr Walsh has been able to implement these across several Rio divisions.  The key concepts used are problem solving methods, eliminating variations and removing waste.

Sam Walsh says “If I look at the various things I have shamelessly lifted from the car industry, the most obvious is the business improvement model”[2].

One of the areas that Mr Walsh highlighted was that Mining is no different to any other business and that data is of high importance.  His vision is to create a seamless and controlled environment comparable to a well-oiled production line, allowing the handling of billions of tons of dirt annually in a smooth manner.  The aim is to utilise automation enabling repeat processes and clear forecasting.  Just like in a car factory that combines many different parts to build the car, the mining operations have the same principles apply to them in areas such as planning, scheduling and product flow.

On the forefront of all this is communication backed up by knowledge of individuals and data to support the operations.  Principles like JIT (Just in Time) are readily used and form critical foundations for the day to day operations.  Mr Walsh discusses change as an important part, driven by a centralised decision making structure.

With the concept of running the Pilbara with the principles of a Toyota factory, the results were to look at the processes required, and the control needed to ensure a smooth supply chain supported by data.  Mr Walsh told the Federation of Automotive Products Manufacturers: “What they now see is a business that is very sophisticated and in some ways more sophisticated than areas of the automotive industry”[3].

I would highly recommend that you read the article by Peter Roberts from the AFR Boss Volume 13 in October 2012.  It further proves the case and need for implementations like our Lean Resources and Lean Construction to ensure long term sustainability of these industries.

One are Mr Walsh did not directly address, but which is critical to the success of any change and business program is leadership and culture.  Through the right leadership we can foster a culture that will create innovation from within.  The Chase leadership and culture programs address just this.

Lean in resources is widely used and with the use of government incentive programs, we can deliver programs over a twelve to eighteen month period, with a pay back of less than two months in most cases.  All programs are delivered on site, and focus on project implementation, and supporting the organisation with extra resources enabling their resident lean improvement specialists to achieve even better outcomes.

Have a look at one of our case studies with Leighton's HWE Mining or read up on how we are assisting over 700 people at Bluescope Steel in the same way.  There are many more case studies, but at the end, we will collaborate with you and create a partnership that will allow for the creation of a program that suits your business, whether it is supporting what you already do, or implementing a whole new program.

For more information, please contact us at Chase Performance on 1300 880 338 or contact us through our web site www.chaseperformance.com



[1] Roberts, P (Oct 2012), Drilling Down, Australian Financial Review: Boss, Innovation Section (pages 16-24)
[2] Roberts, P (Oct 2012), Drilling Down, Australian Financial Review: Boss, Innovation Section (pages 16-24)
[3] Roberts, P (Oct 2012), Drilling Down, Australian Financial Review: Boss, Innovation Section (pages 16-24)

Tuesday, August 21, 2012

Increasing Productivity and Client Satisfaction


Melbourne 28th & 29th August 2012
2nd Annual LCI Australia - Increasing productivity and client satisfaction

You will agree that there is a lot of waste in the processes of our sector the newly formed LCI Australia network is bringing the focus back to improving the processes and outcomes delivered by our sector. Lean business practices bring the focus back to increasing value for the client, eliminating non value adding inputs and making sure all work flows reliably. 

Consider joining your industry colleagues at the 2nd Annual LCI Australia conference, the annual gathering for senior managers, industry leaders and Lean practitioners who are focussed on improving the efficiency of business practices and outcomes in our sector. Only 2 weeks to go so book your place today and forward this to your colleagues.

The 2012 conference will bring 60-70 attendees together all ready to actively participate in group discussions, Q & A and networking over the course of the 2 days conference, workshop and Industry Dinner. We invite you to share your experience and views as we delve into this year’s theme: Increasing productivity and client satisfaction

LCI 2012 will provide an overview and insight into the general practice of LEAN. Starting and sustaining an ongoing transformation on projects or in organisations, understanding the resistance to and motivation for change. The conference offers industry speakers full of case studies, experiences sharing the problems they have encountered in implementing lean thinking in their workplaces and solutions. Indications and examples of costs and benefits achieved through Lean implementation and sharing the results, including both traditional measures and longer term benefits are some of the tangible benefits of attending LCI 2012. 

Program is packed with Case studies, tools and research all the details are available on the website; 

·         CASE STUDY - Building lean capability Angela Corriero and Hunter Dean, Chase Performance / Systemix

Resistance to and motivation for change are key factors in determining successful Lean project delivery.
Angela is a Lean culture specialist who spent considerable time with Toyota in Japan and using this global experience will illustrate how problems can be eliminated before they even start – it’s a matter of building Lean capability into not only your project delivery, but within your fundamental business development
structure.

·         CASE STUDY - Lean Construction for Home Builders Brian Levitan, Managing Director, Lean Australia

In March 2011 the NSW Government organised a program aimed at construction companies and their suppliers. 10 companies signed up, in Dubbo and Mudgee consisting of 2 Builders, 4 Construction support service, and 4 mining/mining Support companies. This session describes the program, training challenges for the level of staff, success factors, roadblocks, and results for example Scott Hawkins Homes have reduced the time to build a house by 30% using Lean
construction tools, and can build 30% more houses with the same overhead. Most importantly, although the ‘Project’ finished over a year ago, the companies have internalised the culture change, and are still engaged in ongoing continuous improvement.

·         CASE STUDY - Techniques for improving productivity and client satisfaction Alex Kunz and Mick Jackson, Gehry technologies, Blue Ocean Consulting

Examples where the implementation of new processes and technology has led to project-wide performance improvement of commercial and civil construction projects. Particular focus will be on non-financial improvements and their corollary effect on project financial performance.

Lean practices, tools like ‘Last Planner’ and cultural alignment are explored through interactive sessions in 2 half day workshops on 29th August. I have attached the conference brochure so you can see the full speaker line up and it’s an exciting mix this year. 

Discounts available to LCI members / AAA members / EA Members and AME members. Student discount also available so book your place today.

We look forward to seeing you there.












P.S If you are not an LCI Australia member why not join today and enjoy the benefits of discounted rates to the Annual Conference and the FREE Regional Events Join LCI AU Today.